Building Project-- Days 96-?

Sorry, folks. I've lost count of days. Between school and a recent bout of sickness, I just don't have the motivation to figure it out right now. But I do have pictures of what's happened this last month or so.

The back patio was cut into pieces and hauled away.


Everything was re-graded, and gravel was added. A new patio will wait until after winter.


Dry wall was finished; that stuff is messy!


Gutters and downspouts are in place.



Instead of a hole, we have a deadbolt.


This picture shows priming in progress, but it's all done now.

Other notable changes-- the heaters are in and working to keep the proper temperature for paint drying. The trim and interior doors were delivered. We've picked out the flooring, and it's scheduled to be installed the first week of December. 

Folks, these are exciting times-- even if I'm not posting about it as often.